Saturday, March 31, 2012
All hands on deck
With the sheer clamps and footbrace backs installed, the deck is next. I added a couple small deckbeams fore and aft, and installed a couple of additional bulkheads very near the bow and stern (just visible at the top of the photo at left). Not sure why. The hull was plenty stiff without them. I just wanted some clean storage compartments, really, and I was envisioning tiny little loose things rattling around and getting jammed in those tiny wedge spaces at the bow and stern, so I just closed them off. Then I gave the inside a second thin coat of epoxy. Ready for decking.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment